An artificial grass sub base is the compacted layer of crushed aggregate between the native soil and the turf. For lawns it is 3 to 4 inches of Class II road base or decomposed granite, laid over a weed barrier, dampened, and plate-compacted to about 90 percent on a 1 to 2 percent drainage fall. It gives the turf a surface that does not move, drains water through the backing, and holds nails. Dog runs swap in clean crushed stone with no fabric under the turf. Concrete and rooftops skip the base entirely and use a foam drainage pad.
Sub base by use
| Use | Base material | Compacted depth | Notes |
|---|---|---|---|
| Residential lawn | Class II road base + DG finish coat | 3 to 4 in | Weed barrier below base. 4 in on clay soil or heavy traffic. |
| Pet run / dog daycare | Washed crushed stone, 3/8 clean or 3/4 minus | 2 to 4 in | No fabric under the turf. Drainage grid under heavy use. Zeolite infill on top. |
| Putting green | Road base + fine DG screed | 4 in | Contours are shaped in the base, not the turf. Screed and compact twice. |
| Playground | DG or road base + shock pad | 2 to 4 in + pad | The pad does fall protection (ASTM F1292), sized to fall height. The turf does not. |
| Sports field | Engineered aggregate + shock pad | Per engineer | Sub-base to GMAX / HIC spec. Not a landscape-crew build. |
| Concrete, pavers, rooftop | None. Foam drainage pad | 0 in | Skip excavation. Glue down over a 1/4 to 1/2 in drainage mat. Slab must drain. |
Depth is measured after compaction, not as loose material. The two-layer lawn build most Southern California crews run is 2 to 2.5 inches of crushed rock or road base compacted first, then a 1 to 1.5 inch decomposed granite finish coat screeded flat and compacted again. The road base does the structural work; the DG gives you a smooth plane so the turf backing sits flat and the pile reads even.
The three materials, and when to use each
Class II road base is 3/4-inch minus crushed aggregate with fines. The fines lock the stone together under a plate compactor, which is why it holds a grade and holds nails better than anything else on the list. It is the default structural layer for lawns, greens and commercial landscape.
Decomposed granite is finer, spreads and screeds easily, and is the standard finish coat in Southern California, Arizona and Nevada. Order plain DG. Stabilized DG (the kind sold for pathways) has a binder that turns hard and stops draining, and it does not belong under turf. On sandy, well-drained soil some crews run DG for the full 3 inches; it compacts softer than road base, so hold the depth at 4 inches if you do.
Washed crushed stone (3/8 clean or 3/4 minus with the fines rinsed off) is the pet-turf base. It drains several times faster than road base and does not hold urine the way fines do. Pair it with a permeable or perforated turf backing and zeolite infill, and the odor complaints stop before they start.
How much base to order
Cubic yards equal square feet times depth in feet, divided by 27. Aggregate yards run roughly 1.4 tons per cubic yard, so a 1,000 square foot lawn at 3 inches is about 9 yards or 13 tons before compaction. Order 10 percent over the table below to cover compaction and the low spots you will find once the grass is stripped.
| Area | 3 in deep | 4 in deep | ||
|---|---|---|---|---|
| 500 sq ft | 4.6 cu yd | 6.5 tons | 6.2 cu yd | 8.6 tons |
| 1,000 sq ft | 9.3 cu yd | 13.0 tons | 12.3 cu yd | 17.3 tons |
| 2,000 sq ft | 18.5 cu yd | 25.9 tons | 24.7 cu yd | 34.6 tons |
| 5,000 sq ft | 46.3 cu yd | 64.8 tons | 61.7 cu yd | 86.4 tons |
Columns: cubic yards, then tons at 1.4 tons per yard. Ask your aggregate yard for the actual density of their road base; DG runs lighter.
Grade, water, compaction
Excavate 3 to 4 inches below the finished height of the surrounding hardscape so the turf ends up flush, then cut a fall of 1 to 2 percent, about one inch of drop per 10 feet, away from the house. Spread the base in lifts no thicker than 2 inches, dampen each lift until it holds a print without puddling, and run a vibratory plate compactor in overlapping passes in two directions. Done right you can walk it in boots and leave no mark. Screed the DG coat with a straight board, compact again, and lift the turf onto it. Never drag a roll across a finished base; it gouges the plane you just built.
Weed barrier and gopher wire
On a lawn the weed barrier goes on the excavated soil, under the base, seams overlapped 6 to 8 inches and stapled. It stops the weeds that would otherwise push through the drain holes in year two. On pet turf the rule flips: no fabric directly under the turf, because it holds moisture and urine odor. If the site needs a membrane, it goes below the sub-base.
Gopher wire is galvanized hardware mesh laid on the soil before the base in gopher country, which covers most of the Inland Empire, the High Desert and the Central Valley. Without it a gopher tunnels under the base, the base collapses into the run, and the turf sinks in a line you can see from the street. Both accessories ship on the same truck as the rolls; ask your rep to add weed barrier (6 by 300 foot rolls) and gopher wire (4 by 100 foot rolls) to the order.
Five base mistakes that cause callbacks
- Too thin. Two inches of base over clay heaves and dips with the first wet winter. Hold 3 to 4 inches.
- Not compacted. Raked-smooth is not compacted. Footprints in the base become footprints in the turf.
- No fall. Flat base, standing water under the turf, algae and smell. Cut the 1 to 2 percent.
- Fabric under pet turf. Traps urine. Move it below the base or leave it out.
- Rolls dragged across the finish coat. Every gouge is a low spot. Lift and place, then let the turf relax 30 to 60 minutes in the sun before cutting.
Frequently Asked Questions
What is the best sub base for artificial grass?
Class II road base (3/4-inch minus crushed aggregate) compacted to about 90 percent, finished with a 1 to 1.5 inch coat of decomposed granite for a smooth surface. In dog runs use washed crushed stone (3/8 clean or 3/4 minus) instead, because it drains faster and does not hold odor.
How deep should the sub base be under artificial turf?
3 to 4 inches for lawns and most landscape installs, measured after compaction. Go to 4 inches on clay soil, high-traffic paths, and putting greens. Pet areas run 2 to 4 inches of clean stone. Sports fields and playgrounds are engineered separately with a shock pad on top of the base.
Can you use decomposed granite for artificial turf?
Yes, and in Southern California, Arizona and Nevada it is the standard finishing layer. Use plain DG, not stabilized DG, spread 1 to 1.5 inches over compacted road base or crushed rock, dampen it, and plate-compact it flat. DG on its own for the full depth works on well-drained soil but locks up softer than road base.
Do you need a weed barrier under artificial grass?
For lawns, yes: landscape fabric on the excavated soil, under the base, with seams overlapped 6 to 8 inches. In dog areas skip it or put it below the sub-base, never directly under the turf, because fabric under pet turf traps urine and odor.
Can I lay artificial grass on soil without a base?
You can, and it fails. Soil moves with water and roots, so the turf develops low spots, wrinkles and open seams within a season or two, and the warranty does not cover an install without a compacted base. The base is most of the labor and nearly all of the longevity.
SourcesSynthetic Turf Council
Price the Turf and the Base Accessories.
Wholesale pricing, spec sheets, weed barrier, gopher wire, nails and infill on one order, factory-direct from Fontana.
Request the Wholesale SheetOr call 888-9-MIGHTY